When making an estimate for the time and cost to execute a project,

8.   When making an estimate for the time and cost to execute a project, should the time and cost required to develop the planning, monitoring, and controlling systems be included as well?  Should the actions required to monitor and control a project be included in the project’s action plan or WBS?

 

 

9.   The chapter includes an example of a firm where the PM dispensed with all the planning formality because no one ever looked at it anyway.  What did the PM think the purpose of such planning was in this firm?  What should the firm do in the future to correct this problem?

 

10. In such fields as psychology and sociology, verbal characterizations are frequently used to show the amount of some factor.  How might one set up such a measure for a project management characteristic such as the “energy” of the project team?

 

11. How might one measure team morale?

 

12. How can the PM circumvent the problem that the monitoring system can only report on activities that have passed, thus telling the PM what has already gone wrong but not what will go wrong in the future?

 

13. How might using electronic media to report project information lead to problems with control?

 

14. Explain how the earned value chart captures all three objectives of a project: performance, cost, and schedule.

 

15. Why isn’t there an earned value reporting convention that allows progress on a task to be credited when the task is half completed?  Wouldn’t this be more accurate than giving credit only when the task is fully completed?

 

16. When would spending and schedule variances be more informative than ratios?  When would ratios be better?

 

17. How should a PM reconcile the dual purposes of control: conserving resources and regulating results through the use of resources?

 

18. Identify situations where each of the following control tools might be useful: earned value charts, benchmarking, critical ratios, control charts, variance analysis, trend projections.

 

19. How might the existence of a change control system affect the behavior of a client, or a project team member, who desires to make a change in the project?

 

20. “In order to manage for overall project success, control must be exercised at the detailed work level for each aspect of project performance or no significant change will occur.”  Does this mean that the PM should micromanage the project?  If not, what does it mean?

 

21. Select a hypothetical project (e.g. designing and building a Web site, installing a new machine in an assembly line, or conducting a major inspection and repair of a passenger aircraft), and briefly describe an example of how each of the following types of control data might be used for project control:

(a)  Frequency counts

(b) Raw numbers

(c)  Subjective numeric ratings

(d) Indicator and surrogate measures

 

22. Of all the rules for conducting meetings, the most difficult to enforce is the injunction against the weekly (or daily) standard project progress report (the “show and tell” meeting).  Why is this, and under what circumstances do you think such meetings are justified?

 

23. If your project management software calculates earned value, or any other standard item to be reported, differently than the Project Management Institute suggests, should you deal with this matter in management reports?  If so, how?

 

24.       Logically, when using earned value data in the critical ratio formula, should the “budgeted” cost be the planned value or the earned value?  What problems occur with each choice?

Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more